Capabilities

Vibratory Caisson Installation

Caisson installation using vibratory methods — fast, clean installs where soil conditions allow.

Caisson installation using vibratory methods — fast, clean installs where soil conditions allow.

A vibratory hammer drives the caisson without the spoil and cure time of a drilled foundation, which keeps line projects moving in the right soils.

Crane crews handle the full pick-set-drive sequence, coordinated with the structure schedule.

Scope of work

  • Vibratory caisson driving
  • Crane support and rigging
  • Foundation installs in suitable soils
  • Coordination with structure schedules
  • IBEW-affiliated union crews on every job.

  • Storm-tested standards — 91,114.5 incident-free hours across two hurricane seasons.

  • Serving Michigan, Ohio & Florida from four yards.

Crane crew setting a caisson at a transmission line site

Have a program or a project?

Talk it through with SPE — scheduled work or storm season.